So where do you go when this is the location of the commode? When Raymond and I got there on Sat. afternoon we found lots of work had been done. The men had torn all the walls out to the studs, the old tub was broken and carried out in 2 pieces.
This is the floor tile that was laid on Sat. in the bathroom. The hardy-backer board was placed in the shower and on the floor before the tiles. New sheetrock is on all the surfaces. A leaking copper tubing line was the cause of the circles on the ceiling. They repaired the line and then got the sheetrock up.The walls are Spanish drag textured and will be painted on Sunday.
Sunday: The painting has been done and the tiles are up in the shower. Tomorrow the grouting will be done and the new sink and cabinet will be placed. I'm hoping for Momma's sake, they get the commode placed soon.